Adding a second garage door opening in Stittsville: what does the City require?
Adding a second garage door opening in Stittsville: what does the City require?
Adding a second garage door opening means cutting a new hole in the garage wall, which the City of Ottawa treats as a structural alteration. That triggers a building permit requirement before work begins.
The City's permit list includes "interior and exterior structural alterations, such as enlarging or relocating a window or door." A brand-new opening goes further than enlarging an existing one, so it falls squarely in permit territory. The City's exempt list covers only "replacing doors or windows provided they are in the same size opening," which does not apply here.
What the permit process involves for this job
The permit is issued by the City of Ottawa. The 2026 fee schedule sets the rate at $12.75 per $1,000 or part thereof of the assessed valuation of the work, with a minimum fee of $117.00. The City calculates the fee from the assessed value of the work, so ask the City for that figure once you have a contractor's quote in hand.
Cutting a new opening in a loadbearing wall also brings the Ontario Building Code into play. The Code requires that openings in loadbearing walls greater than the required stud spacing be framed with lintels designed to carry the superimposed loads to adjacent studs (Division B, 9.23.12.2.(1)), with lintel spans and sizes drawn from the Code's span tables (9.23.12.3.(1)). Ask your contractor who prepares the framing details for the permit.
If the new opening needs a new electrical outlet or circuit for an opener, that is separate electrical work. A Licensed Electrical Contractor files the notification of work with the Electrical Safety Authority before that work starts.
One more thing to check before any work is quoted: if your home is designated as a heritage property or sits within a Heritage Conservation District, the City of Ottawa's heritage page says all alterations to designated heritage properties and to properties within a Heritage Conservation District require City approval, and the City's permit exemptions do not apply. Contact a Building Client Service Centre representative for the specific requirements for your address.
Before agreeing to anything, ask the contractor whether their quote includes pulling the building permit and who is responsible for filing it.
Want this done at your place?
Tell us what is wrong with your garage door, or what you want replaced, and we'll send it to local Ottawa garage door companies, who reply by email. We send it out to local contractors for you. Free, no pressure.
Garage Door IQ -- Built from the Ontario Building Code, Ontario regulations and City of Ottawa sources and real construction experience. Answers are for informational purposes only and are not a professional assessment.
Ready to Get Quotes?
Find local garage door companies in Ottawa. Free matching, no obligation.